Skip to content

Industrial and warehouse

Steel warehouse and workshop buildings, platforms, fire protection and power installations: robust, fast and code-compliant work in production and storage areas.

Industrial buildings need strength, speed and code compliance at the same time. We handle the steel structure, roof, fire protection installation and electrical infrastructure in one design; fabrication runs ahead in the workshop to shorten erection time on site.

How we work

At the site visit ground conditions, spans and loads are determined; structural and MEP designs are prepared with our partner engineers. Galvanizing and coating run through our solution partners, erection and MEP installation are done by our own team.

Works planned together

Service groups we usually run together for this building type.

Frequently asked questions

How long does a steel warehouse take to build?

It depends on tonnage, span and site conditions. Because members are prepared in the workshop and assembled on site, it is significantly shorter than reinforced concrete; we share the schedule after the site visit.

Is a fire protection installation mandatory?

The regulation decides according to building type, area and hazard class; we clarify the requirements at the site visit.

Can you work while production continues?

Yes. We divide the site into sections and set up a work programme that does not disrupt production.

Get a quote for your Industrial and warehouse project

We will define scope and schedule together at the site visit.