Industrial and warehouse
Steel warehouse and workshop buildings, platforms, fire protection and power installations: robust, fast and code-compliant work in production and storage areas.
Industrial buildings need strength, speed and code compliance at the same time. We handle the steel structure, roof, fire protection installation and electrical infrastructure in one design; fabrication runs ahead in the workshop to shorten erection time on site.
How we work
At the site visit ground conditions, spans and loads are determined; structural and MEP designs are prepared with our partner engineers. Galvanizing and coating run through our solution partners, erection and MEP installation are done by our own team.
Works planned together
Service groups we usually run together for this building type.
Steel structure
Warehouse and workshop load-bearing systems, sandwich panel roofs, platforms and service bridges, fire escape stairs.
Fire and electrical
Sprinkler and hydrant lines, pump sets; panels, power distribution, earthing and lightning protection; cameras and detection.
Mechanical
Plumbing, heating, ventilation and exhaust systems.
Frequently asked questions
How long does a steel warehouse take to build?
It depends on tonnage, span and site conditions. Because members are prepared in the workshop and assembled on site, it is significantly shorter than reinforced concrete; we share the schedule after the site visit.
Is a fire protection installation mandatory?
The regulation decides according to building type, area and hazard class; we clarify the requirements at the site visit.
Can you work while production continues?
Yes. We divide the site into sections and set up a work programme that does not disrupt production.
Get a quote for your Industrial and warehouse project
We will define scope and schedule together at the site visit.